Instrumentation Engineering · Semester 8 · what 4 previous papers show
The topics that came up in the most papers.
#1
Specification Sheet
Asked in 4 of 4 papers
#2
Instrumentation Standards
Asked in 4 of 4 papers
#3
Hook up diagram
Asked in 4 of 4 papers
What each question covers and how many marks it carries.
| Question | Covers | Marks |
|---|---|---|
| Q15 parts | Project Definition, Roles, FAT, SAT, CAT | – |
| Q22 parts | Project Scheduling, Specification Sheet | 20 |
| Q32 parts | Hook Up Diagram, Purchasing Process | 20 |
| Q42 parts | Check Out Procedure, Loop Wiring Diagram | 20 |
| Q52 parts | Instrumentation Standards, Junction Box Wiring | 20 |
| Q63 parts | Process Flow Diagram, Instrument Location Plan, Instrument Punch List | – |
| Total | 80 | |
The paper data does not say which module a question belongs to, so this is shown by question.
Tap a topic to read the questions that were asked.
Each box is one paper. The number is how many questions were on that topic. Empty means it was not asked.
| Topic | May’15 | Dec’15 | May’17 | Dec’18 |
|---|---|---|---|---|
| Specification Sheet | 1 | 1 | 1 | 1 |
| Instrumentation Standards | 1 | 1 | 1 | 1 |
| Hook up diagram | 1 | 1 | 1 | 1 |
| Instrument Location Plan | 1 | 1 | 1 | 1 |
| Roles | 1 | 1 | 1 | 1 |
| Checkout procedure | 1 | 1 | 1 | |
| HMI specification | 1 | 1 | 1 | |
| Project Definition | 1 | 1 | 1 | |
| Documentation software | 1 | 1 | 1 | |
| Project Planning | 1 | 1 | ||
| Project Scheduling | 1 | 1 | ||
| Loop Wiring Diagram | 1 | 1 |
Came back after a gap
Was asked before, missing this time
The total marks have changed over the years: 80, 100.
2018
MayDec
2017
MayDec
2016
MayDec
2015
MayDec
Crossed out means we do not have that paper yet.
Based on 4 papers, 2015 to 2018. The questions were read from the papers by software, so a few details may be wrong. 3 of the papers were harder to read.